skip to main | skip to sidebar

P & C Travels for 2008

Sunday, May 18, 2008

Electrical Addition


Working on a rock house makes adding electrical interesting.
Philip added a switch to an outlet and had to bend schedule 40 1/2" pipe for the project.
Ah but it looks good and fits around the sprinkler cover.
Posted by P & C at 4:34 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Past Adventures

  • Mailboxes
  • Travel 2009
  • Travel 2007
  • Travel 2006
  • Travel 2005
  • Ghia 50th Trip

Blog Archive

  • ▼  2008 (262)
    • ►  December (14)
    • ►  November (32)
    • ►  October (34)
    • ►  September (40)
    • ►  August (18)
    • ►  July (30)
    • ►  June (16)
    • ▼  May (22)
      • New VW garage
      • Philip's New Garage
      • Checking Lines
      • Roots II
      • Tree Time
      • Conquering Trees
      • Water Crossing
      • Digging Up Roots
      • Lamp Post in the Park
      • Root Reduction
      • Electrical Addition
      • Moving Dirt
      • Logging Operations Day 3 - Moats
      • Logging Operations Day 2
      • Logging Operations Day 1
      • Break Time in the New Shed
      • Painting Day
      • We Have a Gate
      • Gate Prep
      • Shed Construction Day 4
      • Supply Run
      • Shed Construction Day 3
    • ►  April (20)
    • ►  March (11)
    • ►  February (12)
    • ►  January (13)